Surveying for construction sites

From the pre-design base map to the as-built survey: setting out, earthworks volumes and progress mapping for your site.

Site progress orthophoto — Surveying for construction sites Site progress orthophoto

Surveying matters three times on a construction project: before design, during construction and at handover. Design needs an accurate base map, construction needs error-free setting out, and handover needs an as-built survey showing what was actually built.

Using drones and GNSS together, we run all three stages, so every survey sits on the same coordinate system and the same control points.

  • Pre-design base map and site levels
  • Building, grid line and pile setting out
  • Cut-and-fill volumes for progress payments
  • Periodic drone progress orthophotos
  • As-built survey and design comparison

Before design

Architectural and structural design is drawn on a base map of existing conditions. Missing or outdated levels affect everything from excavation quantities to how the building sits on the plot — especially on sloping sites.

During construction

Foundations, grid lines and piles are set out from design coordinates, with every session verified on a known point. As earthworks progress, drone surface models document cut and fill; recurring surveys on the same control give an indisputable basis for progress payments.

At handover

An as-built survey compares what was built with the design: building corners, kerbs, utility lines and levels are surveyed, drawn and deviations reported. It is the record used at acceptance and for every later alteration.

Deliverables

What you receive

DeliverableFormatUse
Base mapDWG / NCZDesign and permit base
Setting-out recordXLSX / PDFPoints marked on site
Volume reportPDF + XLSXCut-and-fill, progress payments
Progress orthophotoGeoTIFF / ECWPeriodic site record
As-built drawingDWG / DXFDesign comparison, acceptance

Frequently asked questions

How often should a site be surveyed?

Setting out happens as needed. Earthworks and progress tracking are usually monthly or tied to payment periods, fortnightly during heavy earthworks.

Does a drone flight stop work on site?

No. Plant can keep working; only the take-off and landing point is agreed for safety.

Why is an as-built survey needed?

It is the only record proving the work matches the design, and it is what everyone relies on to find buried services and plan later changes.